Commercial Recreational Marina

Highwater Dock Facility Guide

1. Dock Facility Name and Owner/Permittee: _______________________________

2. Address and Telephone Number of Dock Facility: _________________________

3. Point of Contact for Facility (Name and Telephone #): _____________________

4. Dock Facility Location:

River/Creek: _________________________________________________

River Mile: ______________

Pool (Emsworth, Montgomery, Point Marion, etc.): _________________

Left Descending Bank: _____

Right Descending Bank: _____

Normal Pool Elevation at Dock Location: ___________

Nearest Downstream Facility (Commercial or Recreational) (both banks): ____________________________

5. Total Number of Slips Available or Permitted : _____

Number of Slips actually in use or constructed: _____

6. Although not a requirement, has your Commercial Recreational Marina Facility Guide been prepared or reviewed by a Marine Professional or Individual Qualified as such?:

Yes: ___ No: ___. If yes, please indicate name of individual/firm, and date technical review was performed:_____________________________________________

7. Based upon your or your consultant's technical review, will your Department of the Army Permit need to be revised? (i.e. additional pipe pilings or cluster pilings, dolphins, new abutments, dock relocations, etc.): Yes: ____ No: ____

8. How will you be determining when to begin your Emergency High Water Procedures? (Check all Applicable): River Gauge(s): ____; Which Gauge(s): ________

Internet: _____; Web Site: _____________________________________

NOAA: _____________________________________________________

Corps of Engineers/Lockmaster: _________________________________

River flows and/or Lock Gate openings: _____________________

Historical Knowledge of your marina: ____________________________

Other (explain)_______________________________________________

9. Emergency High Water Procedures:

1st Action Elevation above Your Normal Pool: _________

Procedure (i.e. additional lines added, additional dead men attached, etc.):______ narrative if necessary)

2nd Action Elevation above Your Normal Pool: __________

Procedure (i.e., notification of boat owners, begin vessel removal, mooring rings): (attach narrative if necessary)

10. Return this Marina Guide to:

U. S. Army Corps of Engineers, Pittsburgh District
Regulatory Branch
William S. Moorhead Federal Building
1000 Liberty Avenue, 21st Floor
Pittsburgh, PA 15222-4186

ATTN: Linda Everley/Linda Malsch